Detailed design for Lot 1 within São Paolo Metro Line 2 “Linha Verde” Includes permanent [+]
Aricanduva Station, Line 2 of the São Paulo Metro




- Client: CETENCO-ACCIONA-FERREIRA GUEDES
- Country: Brazil
- Start date: 2019
- Ending date: 2020
SENER undertakes the detailed project to implement civil, infrastructure and Front Office (FO) work at the Aricanduva Station-lot 6 of Line 2 (Green) of the São Paulo Metro, including:
- civil engineering for construction work;
- architecture: project consolidation, finishes, visual communication, lighting, landscaping and urban planning, fire prevention and evacuation routes;
- Infrastructure: hydraulic installations, use of space, surveys, embedded and buried elements, planning of technical rooms, lighting and plugs, security/CCTV system, cable trays, medium voltage grounding network, atmospheric discharge protection system, grounding and flat bar;
- preventive inspection report;
- complementary topographic study;
- specialized BIM consulting;
- Front Office.