Infrastructure

Aricanduva Station, Line 2 of the São Paulo Metro

Image Gallery
Prev Next
Metro Sao Paulo Metro Sao Paulo
Metro Sao Paulo
Metro Sao Paulo
  • Client: CETENCO-ACCIONA-FERREIRA GUEDES
  • Country: Brazil
  • Start date: 2019
  • Ending date: 2020
Download datasheet

SENER undertakes the detailed project to implement civil, infrastructure and Front Office (FO) work at the Aricanduva Station-lot 6 of Line 2 (Green) of the São Paulo Metro, including:

  • civil engineering for construction work;
  • architecture:  project consolidation, finishes, visual communication, lighting, landscaping and urban planning, fire prevention and evacuation routes;
  • Infrastructure: hydraulic installations, use of space, surveys, embedded and buried elements, planning of technical rooms, lighting and plugs, security/CCTV system, cable trays, medium voltage grounding network, atmospheric discharge protection system, grounding and flat bar;
  • preventive inspection report;
  • complementary topographic study;
  • specialized BIM consulting;
  • Front Office.

Other programs

See all
Fonte Nova Stadium

Fonte Nova Stadium in Salvador, Bahía (Brazil).  The Project of Fonte Nova Arena Stadium, has been carried [+]

Share
Share:
Contact Up Up