Infrastructure

Expansion of the San Jose del Cabo International Airport

Image Gallery
Ampliación del Aeropuerto Internacional de San Jose del Cabo
Ampliación del Aeropuerto Internacional de San Jose del Cabo
  • Client: GARZA PONCE CONSTRUCCIÓN
  • Country: Mexico
  • Start date: 2019
  • Ending date: 2019
Download datasheet

The work to expand the airside of the T3 International Terminal by 12 meters has various specific scopes:

  • Extend by 12 meters from centerline 1, which consists of a new 9-meter centerline and a 3-meter overhang that supports the originally designed façade.
  • Relocation of the central staircase connecting Level 5.05 to Level 6.60 in order to avoid interference with the main structure.
  • Redesign of the service area including the elevator, ramp  and trash chute.
  • Design of the Sanitary Module in its new location

Other programs

See all
Share
Share:
Contact Up Up