Infrastructure

Porto LTR Network

Image Gallery
Prev Next
Metro ligero de Oporto Metro ligero de Oporto
Metro ligero de Oporto
Metro ligero de Oporto
  • Client: Metro do Porto S.A.
  • Country: Portugal
  • Start date: 1994
  • Ending date: 2012
Download datasheet

SENER has been involved throughout the entire implementation of the Porto Light Rail. 

SENER, as leader company of the European Economic Interest Grouping (EEIG) ENSITRANS, has carried out for Metro do Porto, S.A., the management of the technical assistance during the entire network implementation. From preliminary
and feasibility studies (1994) to the election of the system, including preliminary design and tender document elaboration, contractors proposal valuation and later negotiation with prequalifi ed companies, follow up and revision of detailed
design, project management in tunnels construction, and fi nally during testing and commissioning, advising Metro do Porto in the process of certifying the system, services that have been carried out until the year 2012.

Addictionally, SENER has also participated (2006 to 2010) in the Operation & Maintenance Supervision of the entire network operated by the consortium Normetro, which is incorporated by French operator Transdev. Currently, SENER is still working for Metro de Oporto, through its branch in Lisbon, providing Technical Assistance for the contruction of Stage 2.

The entire network which is currently under exploitation comprises 6 lines with a total lenght of 67 km and 71 stations (14 underground). The network covers seven of the nine municipalities in the Metropolitan Area of Porto, second largest city in Portugal and connected to the International Airport of Pedras Rubras.

The System has been designed so that its implementation constitutes an urban regeneration and improvement factor: Recognizing the quality of the project, in June 2008, UITP awarded this system with the Light Rail Award/2008 - Best New System, which honors creativity and design of the light rail systems around the world.

  • Construction start date: 1998.
  • Line 1 Opening: December 2002.
  • Line 6 Opening: January 2011.

Recently in 2018, SENER has been awarded the contract for the extension of Porto Metro Network. SENER will perform the detailed design of the new line (Circular Line) in the section between Boavista/Casa da Música and Praça da Liberdade. It will be an underground section of 2,8 km and 4 stations. The station located at Praça da Liberdade will be a significant challenge as it is located very close to the UNESCO heritage site being the historical city centre.

Other programs

See all
Norte Concession

Road franchise that includes the A7 and A11 motorways, with a total length of 175 [+]

Highway Transmontana

SENER has developed the design and the construction supervision of civil works for a Highway [+]

Share
Share:
Contact Up Up
Cookie configurator

A "cookie" is a small file that asks permission to be placed on your devices. Once the user has accepted, the file is added and helps analyze web traffic or allows you to detect when that user visits a particular Website.

Current law allows us to store cookies on your device, if these are strictly necessary for the operation of our web page, based on the legitimate interest of SENER GRUPO DE INGENIERÍA. Thus, for the rest of the cookies we need your consent, so below we inform you of the different types of cookies that we use in our Website.

Cookie settings Accept all and continue browsing
Your choice regarding cookies on this site

This website uses cookies and / or similar technologies that store and retrieve information when you browse. In general, these technologies can serve very diverse purposes, such as, for example, recognizing you as a user, obtaining information about your browsing habits, or customizing the way the content is displayed. The specific uses we make of these technologies are described below.

  • Necessary cookies

    Technical or necessary cookies: those strictly necessary for the correct functionality of SENER GRUPO DE INGENIERÍA’s Website. They cannot be deactivated as, without them, certain parts of the web may not be available.

     

    Show / hide full list
    Owner Name Purpose Type Length
    infrastructure.sener group.sener - HTTP 1 year
    prod-plat-senerv3.geanetondemand.com CWNWSESSION - HTTP Session
    prod-plat-senerv3.yunbit.es CWNWSESSION - HTTP Session
  • Statistical cookies

    Analysis and statistical cookies: they help to understand how visitors interact with the Website, by gathering and providing information in an anonymous way, such as visits and views on the Website. In addition, they allow us to identify technical problems and find ways to optimize it.

     

    Show / hide full list
    Owner Name Purpose Type Length
    infrastructure.sener _at.hist.# - HTML Persistent
    _ga - HTTP 2 years
    _gat - HTTP 1 day
    _gid - HTTP 1 day
    _pk_id# - HTTP 1 year
    _pk_ses# - HTTPS 1 day
    google-analytics.com collect - Pixel Session
    piwik.geanet.es piwik.php - Pixel Session
  • Marketing cookies

    Marketing cookies: these are used to personalise SENER GRUPO DE INGENIERÍA’s Website and online store, showing personalised product recommendations or information to the user on this or other web sites.

    Show / hide full list
    Owner Name Purpose Type Length
    infrastructure.sener __atuvc - HTTP 1 year
    __atuvs - HTTP 1 day
    _at.cww - HTML Persistent
    at-lojson-cache-# - HTML Persistent
    at-rand - HTML Persistent
    linkedin.com bcookie - HTTP 2 years
    bscookie - HTTP 2 years
    lidc - HTTP 1 day
    lissc - HTTP 1 year
    youtube.com GPS - HTTP 1 day
    VISITOR_INFO1_LIVE - HTTP 179 days
    YSC - HTTP Session
    yt-remote-cast-installed - HTML Session
    yt-remote-connected-devices - HTML Persistent
    yt-remote-fast-check-period - HTML Session
    yt-remote-session-app - HTML Session
    yt-remote-session-name - HTML Session
    doubleclick.net IDE - HTTP 1 year
    test_cookie - HTTP 1 day
    addthis.com uvc - HTTP 1 year
    xtc - HTTP 1 year
Go back Zapisz ustawienia