Fonte Nova Stadium in Salvador, Bahía (Brazil). The Project of Fonte Nova Arena Stadium, has been carried [+]
São Paulo Metro Line 2, Lot 1 “Linha Verde”


Detailed design for Lot 1 within São Paolo Metro Line 2 “Linha Verde” Includes permanent track superstructure, tunnels, shafts and stations.
SENER has been awarded the contract for the detailed design of Lot 1 within São Paolo Metro Line 2 (Green line).
The scope of the contract includes engineering services for the detailed design of Lot 1, Vila Prudente – Dutra section, which is located between the shaft of the Falchi Gianini station and Penha station, including: Double track tunnel excavated with TBM, NATM tunnel for underground maintenance base Rapadura, Vila Formosa station, shafts of Madri, Cestari, João Prioste, Julio Colaço, Soares Neiva, Rapadura, and the bus terminal.
- Section length: 7 km
- Stations: 1
Services include detailed design for permanent track superstructure, tunnels, shafts and stations.
Additionally, for Line 2 ‘Green Line’, SENER has also participated in the following contracts over the past decades:
- 1988-2012. Preliminary and detailed design for Line 2, Alto do Ipiranga – Vila Madalena section.
- 2012-2013. Systems preliminary design for Workshops and Depots in Vila Prudente – Dutra- Pátio Paulo Freire section.
Other programs
See allPreliminary engineering for the metro line and detailed design for roller tracks in the extension [+]