Infrastructure

Highway Transmontana

Image Gallery
Prev Next
Autopista Transmontana Autopista Transmontana
Autopista Transmontana
Autopista Transmontana
  • Client: CAET XXI, Construções ACE (Soares da Costa/FCC/RRC)
  • Country: Portugal
  • Start date: 2009
  • Ending date: 2012
Download datasheet

SENER has developed the design and the construction supervision of civil works for a Highway Concession of 135 km.

The A4/IP4 highway links the city of Oporto in Portugal with the Spanish Border in Quintanilha, and is approximately 220 km long. 

The project includes 132 km of new construction, with 24 junctions, 78 overpasses/flyovers and 137 underpasses. It also includes a cut-&-cover 65 m long tunnel and 17 viaducts, among which it is important to highlight the Tinhela Bridge, which is 2,800 m long and has a maximum span of 116 m, and the Corgo Viaduct, a 2,980 m long cable-stayed bridge with a maximum height of 160 m. It is currently the biggest bridge in Portugal. 

The project and its construction were divided into 11 sub-sections, which were opened to traffic in 2012, the conclusion date of the construction phase and the completion of the services provided by SENER. 

SENER has conducted the global management of the project, specifically the design covering all disciplines and the site supervision of works during the construction phase of the section between Vila Real (Parada de Cunhos) and Quintanilha, included in the Sub-concession of the Transmontana highway. 

Being a design and construction project, it’s important to emphasize the complex coordination between design and technical assistance with the construction of the infrastructure, which requires constant close monitoring of its progress and rapid solutions for the usual problems that occur during the construction of this kind of infrastructure.

  • Project data:
  • 132 new kilometres (2 sections with toll, with a total length of 14 km and 3 toll-free sections with a total length of 120 km) and 3 service areas
  • 24 junctions
  • 142 replacements
  • 240 drainage works
  • 137 structural works (overpasses, underpasses and animal crossings)
  • one 65-m-long false tunnel
  • 17 viaducts, including the cable-stayed bridge over the river Corgo, 2800 metres long and a maximum pier height of 190 metres and 300 m maximum span, and the bridge over the river Tinhela, 268 m long and with a maximum span of 116 m.

 

Other programs

See all
Porto LTR Network

SENER has been involved throughout the entire implementation of the Porto Light Rail.  SENER, as leader [+]

Norte Concession

Road franchise that includes the A7 and A11 motorways, with a total length of 175 [+]

Share
Share:
Contact Up Up
Cookie configurator

A "cookie" is a small file that asks permission to be placed on your devices. Once the user has accepted, the file is added and helps analyze web traffic or allows you to detect when that user visits a particular Website.

Current law allows us to store cookies on your device, if these are strictly necessary for the operation of our web page, based on the legitimate interest of SENER GRUPO DE INGENIERÍA. Thus, for the rest of the cookies we need your consent, so below we inform you of the different types of cookies that we use in our Website.

Cookie settings Accept all and continue browsing
Your choice regarding cookies on this site

This website uses cookies and / or similar technologies that store and retrieve information when you browse. In general, these technologies can serve very diverse purposes, such as, for example, recognizing you as a user, obtaining information about your browsing habits, or customizing the way the content is displayed. The specific uses we make of these technologies are described below.

  • Necessary cookies

    Technical or necessary cookies: those strictly necessary for the correct functionality of SENER GRUPO DE INGENIERÍA’s Website. They cannot be deactivated as, without them, certain parts of the web may not be available.

     

    Show / hide full list
    Owner Name Purpose Type Length
    infrastructure.sener group.sener - HTTP 1 year
    prod-plat-senerv3.geanetondemand.com CWNWSESSION - HTTP Session
    prod-plat-senerv3.yunbit.es CWNWSESSION - HTTP Session
  • Statistical cookies

    Analysis and statistical cookies: they help to understand how visitors interact with the Website, by gathering and providing information in an anonymous way, such as visits and views on the Website. In addition, they allow us to identify technical problems and find ways to optimize it.

     

    Show / hide full list
    Owner Name Purpose Type Length
    infrastructure.sener _at.hist.# - HTML Persistent
    _ga - HTTP 2 years
    _gat - HTTP 1 day
    _gid - HTTP 1 day
    _pk_id# - HTTP 1 year
    _pk_ses# - HTTPS 1 day
    google-analytics.com collect - Pixel Session
    piwik.geanet.es piwik.php - Pixel Session
  • Marketing cookies

    Marketing cookies: these are used to personalise SENER GRUPO DE INGENIERÍA’s Website and online store, showing personalised product recommendations or information to the user on this or other web sites.

    Show / hide full list
    Owner Name Purpose Type Length
    infrastructure.sener __atuvc - HTTP 1 year
    __atuvs - HTTP 1 day
    _at.cww - HTML Persistent
    at-lojson-cache-# - HTML Persistent
    at-rand - HTML Persistent
    linkedin.com bcookie - HTTP 2 years
    bscookie - HTTP 2 years
    lidc - HTTP 1 day
    lissc - HTTP 1 year
    youtube.com GPS - HTTP 1 day
    VISITOR_INFO1_LIVE - HTTP 179 days
    YSC - HTTP Session
    yt-remote-cast-installed - HTML Session
    yt-remote-connected-devices - HTML Persistent
    yt-remote-fast-check-period - HTML Session
    yt-remote-session-app - HTML Session
    yt-remote-session-name - HTML Session
    doubleclick.net IDE - HTTP 1 year
    test_cookie - HTTP 1 day
    addthis.com uvc - HTTP 1 year
    xtc - HTTP 1 year
Go back Zapisz ustawienia